Abstract
Background: The steel manufacturing industry is widely recognised as a key contributor to both developed and developing economies. In South Africa, it contributes about 1.5% to the gross domestic product and remains important for employment and economic growth. It also supplies essential raw materials to downstream sectors. Despite this contribution, the industry faces ongoing challenges such as cheap imports, high transport costs, skills shortages, and weak economic growth. These pressures affect operational performance and threaten customer satisfaction (CS) and customer loyalty (CL), particularly in business-to-business (B2B) markets in which long-term supplier relationships and reliable service are essential for competitiveness and customer retention. In this context, supply chain planning (SCP) has become important for coordinating strategic, tactical, and operational decisions.
Objectives: This study investigated the relationship among SCP, CS, and CL in the South African steel manufacturing industry.
Method: A quantitative approach was used. SCP practices, including sales and operations planning, demand and supply planning (SP), production planning (PP), inventory management (IM), capacity planning (CP), and procurement planning (PL), were examined to assess their influence on CS and CL. Data were collected from key industry participants and analysed statistically using partial least squares structural equation modelling.
Results: The findings show that SCP does not influence CS in a uniform way. Inventory management and PP had significant positive effects, whereas SP showed a significant inverse relationship with CS. Sales and operations planning, demand planning, CP, and PL were not significant. Customer satisfaction, however, had a strong positive effect on CL.
Conclusion: The findings highlight the varying contributions of different SCP practices to CS, which suggests that some practices exert a stronger influence than others. Improving IM and PP remains important for supporting CS and CL within the South African steel manufacturing industry.
Contribution: The study offers empirical insights into how different practices of SCP shape customer-related outcomes in a B2B manufacturing environment and informs managerial decision-making within the South African steel industry.
Keywords: customer loyalty; customer satisfaction; inventory management; production planning; steel manufacturing industry.
Introduction
The steel manufacturing industry is widely recognised as an essential contributor to the global economy in both developed and developing countries. In South Africa (SA), it contributes approximately 1.5% to the country’s gross domestic product (Statistics South Africa [StatsSA] 2025). In addition, the industry plays a key role in supplying essential steel products to major public enterprises and national infrastructure projects, further linking its operations to the country’s broader development goals. Within the manufacturing sector, basic iron and steel production serves as a critical foundation, enabling value addition, import substitution, and the effective functioning of key downstream sectors such as construction, automotive manufacturing, and mining-related industries (South African Iron and Steel Institute [SAISI] 2023). Moreover, the broader steel industry reportedly employs up to 190 000 people, against a high national unemployment rate of 32.9% recorded in 2025 (StatsSA 2025). This figure indicates the significant contribution of capital-intensive manufacturing industries, such as steel, to SA’s socio-economic growth and development. Although it holds substantial strategic value for the nation, the SA steel manufacturing industry faces multiple existential threats that challenge its viability and sustainability. Intense competition from low-cost global producers has increased imports into the domestic market, significantly eroding local market share (SAISI 2023). Over the past 5 years, rising production costs, particularly electricity and logistics, combined with policy uncertainty and weak domestic demand, have contributed to declining production capacity and job losses, highlighting the sector’s vulnerability without targeted industrial intervention. Additional pressures include rising transportation and labour costs, demand volatility, complex global operations, and expanded logistics channels, while retrenchments and plant closures demonstrate the severity of these threats (Raja Santhi & Muthuswamy 2022). As a typical case, the closure of ArcelorMittal’s Vereeniging plant in 2015 and the 2025 wind-down of its long steel operations, including the historic Newcastle plants, illustrate the cumulative impact of weak domestic demand, high energy and logistics costs, and competition from imports, affecting approximately 3500 direct jobs and posing significant downstream risks for regional supply chains (SAISI 2023). These developments emphasise the structural challenges facing SA’s steel sector and underscore the urgent need for policies that support industrial resilience and competitiveness. These industry challenges have transformed competition in the South African steel market. Rather than competing only on price or product quality, steel manufacturers increasingly compete on their ability to deliver reliably, respond quickly to customer requirements, and maintain long-term business relationships. As steel is predominantly supplied to industrial customers, such as mining, construction, automotive, engineering, and manufacturing firms, customer loyalty (CL) is largely determined by consistent operational performance, dependable deliveries, and fulfilled contractual commitments. In this business-to-business (B2B) environment, effective supply chain planning (SCP) is essential for improving customer satisfaction and strengthening long-term customer relationships. However, achieving these outcomes has become increasingly difficult because manufacturers must manage fluctuating customer demand, volatile raw material prices, unreliable transport infrastructure, long procurement lead times, and production scheduling constraints (Ackah 2025; Cheng et al. 2024; Sudjaniah, Utami & Sugiyono 2025). These operational challenges often lead to delivery delays, stock shortages, excess inventory, and reduced responsiveness to customer requirements (Ali et al. 2024). Consequently, coordinating demand, supply, procurement, production, inventory, and capacity planning has become a strategic requirement rather than merely an operational function. This study investigates the influence of SCP on customer satisfaction (CS) and CL, focusing on seven SCP practices: sales and operations planning (SOP), demand planning (DP), supply planning (SP), production planning (PP), inventory management (IM), capacity planning (CP), and procurement planning (PL). The study further examines the mediating role of CS in the relationship between each SCP dimension and CL, addressing key challenges in customer retention from a supply chain perspective. Specifically, the study addresses the following research question: What are the interrelationships among different SCP practices, CS, and CL in the South African steel manufacturing industry? The country’s steel industry maintains critical operational and commercial linkages with national utilities and infrastructure providers, including Eskom and Transnet, which are essential for its viability within the broader industrial ecosystem (Department of Trade, Industry & Competition [DTIC] 2021). However, the industry continues to face ongoing customer dissatisfaction. Domestic steel manufacturers often charge higher prices than imported alternatives do, prompting some buyers to opt for lower-cost Chinese steel imports. At the same time, industrial customers expect dependable deliveries, consistent product quality, and responsive service because disruptions in steel supply can delay production schedules, increase operating costs, and affect contractual obligations. Key customers, including mining, construction, automotive, and engineering firms, depend heavily on timely, reliable steel supply, making CS and loyalty critical to industry survival. In B2B markets, dissatisfied customers are also more likely to diversify their supplier base or switch to alternative suppliers that offer more reliable service, underscoring the strategic priority of customer retention for steel manufacturers. However, efforts to retain customers, along with internal and external challenges such as competition, skills shortages, and economic stagnation, continue to undermine loyalty (Wang, Woodside & Yu 2021). The above challenges in SA’s steel industry highlight the critical role of effective supply chain management (SCM) in sustaining competitiveness and meeting customer expectations. In particular, the ability of manufacturers to plan, coordinate, and execute activities across demand, supply, production, inventory, procurement, sales, operations, and capacity practices can directly influence how customers perceive service reliability, product availability, and responsiveness (Obiri-Yeboah et al. 2025). For industrial customers, these operational consequences are often more important than price alone because they influence production continuity, project completion, and long-term business performance. Understanding how individual SCP practices translate into CS and CL is essential for supporting the industry’s resilience, stabilising downstream supply chains, and safeguarding long-term economic contributions. The current study addresses several research gaps. Firstly, although SCP has been widely researched in other countries (Govindan & Cheng 2018; Reyes, Mula & Díaz-Madroñero 2023; Sengupta, Dreyer & Jonsson 2025), scholarly attention to the SA steel industry is minimal. Available evidence comprises a few studies (e.g. Khoza, Mafini & Loury Okoumba 2022; Mabotja 2022) that only distantly refer to SCP and do not utilise the seven planning mechanisms considered in the current study. Secondly, most existing studies examine SCP from an operational or organisational performance perspective, with limited attention to how different planning practices influence CS and CL in B2B manufacturing environments. In addition, previous studies (Laureano Paiva et al. 2014; Sun et al. 2024) have generally examined SCP as a broad organisational capability, with limited consideration of the individual contribution of specific planning practices. Consequently, it remains unclear whether all SCP practices contribute equally to CS or whether certain planning practices exert a stronger influence than others do. This represents an important knowledge gap because managers require evidence on which planning activities deserve greater strategic attention in resource-constrained environments such as the South African steel industry. Hence, the current study advances supply chain scholarship by empirically examining the interplay among coordinated SCP, CS, and CL in the SA steel industry. The remaining sections of the article are structured as follows: The next section presents the theoretical framework and key literature, followed by the research model and hypotheses. This section is followed by the research section and the study results. The closing sections of the article present the conclusions and implications together with the limitations and suggestions for future research.
Literature
Industrial marketing and purchasing theory
Industrial marketing and purchasing (IMP) are both concerned with managing relationships between buyers and sellers (Ford 1980). Supply chains are built on these relationships because they involve multiple stakeholders working together to transform raw materials into finished products for the final customer. Managing the different stages of the supply chain therefore requires strong relationships among all parties involved. Ford (1997) argues that industrial marketing and purchasing are founded on business relationships, while Ritter, Wilkinson and Johnston (2004) explain that organisations manage relationships within interconnected networks, in which the actions of one firm influence the performance of others. Moorman, Zaltman and Deshpandé (1992) further emphasise that successful business relationships depend on trust, which enables organisations to rely on one another with confidence. Accordingly, trust complements CS and CL in sustaining long-term business relationships. Industrial marketing and purchasing theory underpins this study because effective SCP depends on collaboration, coordination, and trust among suppliers, customers, and internal business functions. Planning activities such as SOP, PL, IM, and CP require firms to share information, coordinate decisions, and maintain long-term relationships. Through these relationship-based interactions, effective SCP enhances CS and ultimately strengthens CL.
Overview of the South African steel manufacturing industry
Structurally, the steel manufacturing industry in SA combines primary steel production with downstream fabrication, encompassing both large-scale producers and smaller specialised manufacturers. Major players include ArcelorMittal, Scaw Metal Group, and SA Steel Mills (SAISI 2023). Chinese firms such as China Baowu Steel Group and HBIS Group have also made inroads into the SA steel manufacturing industry, capturing a significant market share (DTIC 2021). This diversity enables the sector to supply a wide range of steel products for domestic use and regional markets while supporting the inputs needed for other industrial activities. The prevailing integration of primary and downstream operations in the SA steel manufacturing industry demonstrates its capacity to create value across multiple stages of production. The reintegration reinforces its strategic relevance to the economy. Recognising the sector’s importance, the SA government and industry stakeholders developed the Steel and Metal Fabrication Master Plan in 2021. The plan sets out a coordinated strategy to strengthen domestic steel production, promote local value chains, and support industrial growth through collaborative interventions and policy measures (DTIC 2021). By aligning industry, government, and labour objectives, the Master Plan provides a framework to enhance competitiveness and maintain the sector’s contribution to South Africa’s industrial and economic development. Unlike many consumer goods industries, the South African steel industry operates predominantly in a B2B market in which manufacturers supply steel products directly to industrial customers, including construction companies, mining houses, engineering firms, automotive manufacturers, and infrastructure developers. Purchasing decisions are typically based on long-term supply agreements, product availability, delivery reliability, technical support, and supplier performance, rather than one-off transactions. Consequently, maintaining CS and loyalty requires consistent operational performance supported by effective SCP. The South African steel supply chain includes raw material suppliers, steel manufacturers, wholesalers, service centres, logistics providers, and industrial customers. Upstream activities involve sourcing iron ore, coal, and scrap metal, which are processed into steel products before being distributed to customers in the mining, construction, automotive, engineering, and manufacturing sectors. Material flows are supported by continuous information sharing on customer demand, production schedules, inventory, and procurement across supply chain partners (Petropoulos et al. 2026; Sudjaniah et al. 2025). Poor coordination can lead to production delays, inventory shortages, higher costs, and reduced service levels. Effective SCP improves coordination across these activities, enhancing product availability, delivery reliability, and customer service.
Supply chain planning
Supply chain planning refers to an implemented operations planning and control framework with a supply chain scope, aimed at coordinating and synchronising supply- and demand-facing activities to generate value through collaboration and optimisation throughout the supply chain. It involves forecasting demand, aligning sourcing and production activities, and ensuring the efficient flow of materials and information across the supply chain (Sengupta et al. 2025). Within manufacturing, particularly steel production, SCP plays a critical role in demand forecasting, scheduling, inventory control, logistics optimisation, and risk mitigation. The sensitivity of steel processes to market and production fluctuations highlights the need for accurate planning. It has been noted that ineffective SCP persists in the South African steel sector. For instance, the DTIC (2021) noted that high production costs in the steel industry reflect underlying inefficiencies. On a global level, the steel industry’s supply chain faces multiple challenges related to price and demand uncertainty, which affect procurement, inventory planning, and overall performance. To mitigate these risks, steel manufacturers adopt resilience strategies in raw material sourcing, such as diversifying suppliers, maintaining strategic inventories, and using flexible contracts to absorb market fluctuations (DTIC 2021). The current study considers seven SCP practices, drawn from the following studies: Thomé et al. (2012), Taxakis and Papadopoulos (2016), Uzsoy, Fowler and Mönch (2018), and Shabani-Naeeni and Ghasemy (2021). The practices comprise SOP, DP, SP, PP, IM, CP, and PL. These seven factors were selected because they reflect the primary planning functions in steel manufacturing, address key specific industry challenges, and link firm operations to CS and CL, which are customer outcomes. In the South African steel industry, effective coordination of these planning practices is particularly important because manufacturers operate in a volatile environment characterised by fluctuating demand, infrastructure constraints, rising logistics costs, and increasing international competition (Raja Santhi & Muthuswamy 2022). Although previous studies have shown that SCP improves organisational performance, operational efficiency, and supply chain integration (Bhatti & Vui 2025; Petropoulos et al. 2026), little empirical evidence explains whether individual SCP practices contribute differently to CS and CL, particularly in B2B manufacturing environments. This gap is particularly evident in the South African steel industry, in which firms operate under increasing competitive pressure. Accordingly, this study examines seven individual SCP practices rather than treating SCP as a single capability, providing a more detailed understanding of how each practice influences CS and, ultimately, CL. Efficient planning therefore contributes not only to operational performance but also to customer-related outcomes through reliable product availability, delivery performance, and responsiveness to customer requirements (Abdallah, Alfar & Alhyari 2021).
Sales and operations planning
Sales and operations planning is a tactical planning process that aligns business functions to achieve competitive advantage. It integrates sales, marketing, development, manufacturing, sourcing, and finance to balance supply and demand (Kalla et al. 2026). It seeks to maximise profitability by synchronising production, inventory, and procurement with customer requirements; however, its outcomes vary across organisational contexts, particularly where production and supply lead times are short (Kalla et al. 2026). Given the limited empirical work on SCP in steel manufacturing, examining SOP’s role in enhancing CS and loyalty in SA’s steel industry remains both relevant and necessary.
Demand planning
Demand planning refers to a process within SCM that systematically anticipates customer requirements and aligns supply chain activities (such as production, inventory, and procurement) with predicted demand to optimise overall performance and resource utilisation (Buschiazzo, Mula & Campuzano Bolarín 2020). Effective DP enables firms to meet and exceed customer needs, for which accurate forecasting is regarded as a prerequisite. For Buschiazzo et al. (2020), DP aims to determine safety stock and enhance service levels. In contrast, Ali et al. (2024) argue that it shapes demand and informs resource requirements, and its relevance in steel manufacturing stems from its link to coordinated demand and CP systems that enhance SCP.
Supply planning
Supply planning is the process of converting projected demand into practical supply actions by coordinating materials, production capacity, and inventory distribution to ensure products are available in the correct quantities, at the appropriate locations, and at the required time to meet customer needs effectively and efficiently (Anaba, Kess-Momoh & Ayodeji 2024). Petropoulos et al. (2026) posit that operations departments facilitate key supply planning activities and emphasise that firms require efficient SP to be profitable. Furthermore, Anaba et al. (2024) argue that SP is vital for supply chain optimisation and that its objectives include cost efficiency and timely delivery. The steel sector, because of its alignment with global markets, requires effective SP to meet unconstrained demand.
Production planning
Production planning is the tactical process of deciding what products should be manufactured, when they should be produced, and in what sequence, while aligning customer orders with available production capacity and resource limitations to ensure efficient delivery performance. It encompasses production tasks, operational processes, and capacity considerations, with planning decisions influencing product quantities, production methods, and staffing requirements (Yao et al. 2022). Traditional PP models are generally aimed at reducing costs or maximising profitability; however, high production costs, particularly in South Africa, continue to hinder effective PP (DTIC 2021).
Inventory management
Inventory management refers to the process of planning and regulating inventory levels throughout the supply chain to ensure product availability while reducing holding and shortage costs. It plays an important role in controlling costs and satisfying customer demand (Zulu, Pretorius & Van der Lingen 2021). Effective IM improves storage efficiency, reduces inventory carrying costs, and ensures products are available on time to support both customer needs and production activities. As a result, it contributes significantly to operational efficiency, CS, and CL. Within the steel industry, efficient inventory control supports continuous production and enhances organisational productivity by ensuring that essential materials are available when needed (Luthuli & Pradhan 2025). In addition, maintaining balanced inventory levels across steel supply chains helps minimise storage costs, avoid stock shortages, and improve responsiveness to demand and overall operational performance.
Capacity planning
Capacity planning is the process of determining the production resources an organisation needs to meet current and anticipated demand, ensuring that goods and services are delivered in the right quantities, with the right quality, at the right time (Mose & Magutu 2025). It integrates demand forecasting with resource allocation to optimise production, reduce fixed costs, prevent undercapacity or overcapacity, minimise customer complaints, and ultimately enhance operational efficiency and profitability. It varies by context but is critical in manufacturing to manage production lines and forecast demand. It aims to avoid imbalances and ensure capacity sufficiency (Nieto-Rodriguez 2021).
Procurement planning
Procurement planning is regarded as the structured process of organising and preparing procurement activities to ensure that goods and services are acquired in a timely, cost-effective, and legally compliant manner. This process includes forecasting organisational requirements and consolidating internal needs to align procurement activities with budget limitations and regulatory requirements, thereby promoting value creation, reducing procurement risks, and enhancing accountability within organisations (Ackah 2025). In the steel industry, PL is particularly important for securing raw materials in an environment characterised by price fluctuations and demand uncertainty. Effective PL enables organisations to develop purchasing strategies that minimise overall supply chain costs while ensuring the continuous availability of essential production inputs such as iron ore and coke (Cheng et al. 2024). Furthermore, it assists in coordinating departmental material requirements with available budgets, thereby supporting production continuity, reducing procurement-related risks, and improving operational efficiency in steel manufacturing.
Customer satisfaction
Customer satisfaction refers to the degree to which a product or service meets or exceeds customer expectations. It is shaped by both tangible factors, such as product quality and delivery performance, and intangible factors, such as perceived value and service responsiveness (Roberts-Lombard & Jaiyeoba 2025). In this study, CS is operationalised as the degree of fulfilment experienced by steel customers in Gauteng. The literature highlights CS as essential for sustaining competitiveness in the steel industry, particularly given the customised orders, strict delivery schedules, and high costs (Mahajan & Sah 2025). In B2B steel markets, CS extends beyond the quality of the steel product itself. Industrial customers evaluate suppliers based on their ability to meet delivery commitments, respond to operational challenges, maintain product availability, and support uninterrupted production processes (Mahajan & Sah 2025). Consequently, CS reflects the supplier’s overall performance throughout the supply chain rather than a single transaction. From an IMP theory perspective, CS develops through ongoing supplier–customer relationships. When steel manufacturers consistently meet delivery commitments, maintain product availability, and respond effectively to customer requirements, customers perceive greater relationship value, strengthening satisfaction over time rather than through individual transactions alone.
Customer loyalty
Customer loyalty refers to a customer’s continued preference for and repeated purchase of a particular brand’s products over time, despite the presence of competing alternatives. Unlike CS, which represents a short-term emotional reaction after a purchase, loyalty develops gradually through repeated positive experiences and sustained trust (Obafemi, Onyebuchi & Omoyebagbe 2023). In B2B markets, CL differs from consumer markets. Industrial customers generally purchase high-value products over extended periods and often establish long-term contractual relationships with suppliers (Mahajan & Sah 2025). Consequently, loyalty is driven less by emotional attachment and more by supplier reliability, delivery performance, product quality, responsiveness, and the ability to support customers’ operational requirements. Loyalty is commonly classified into behavioural loyalty, reflected through repeat purchasing behaviour, and attitudinal loyalty, which relates to a customer’s long-term preference and willingness to recommend a brand to others. This study adopts the concept of attitudinal loyalty, as it best captures customers’ willingness to recommend steel suppliers based on their experiences with product quality and service delivery. Within the South African steel manufacturing industry, CL is particularly important because industrial buyers often rely on a small number of strategic suppliers to support continuous production and infrastructure projects (Obafemi et al. 2023). These long-term supplier relationships reduce operational risk, minimise supply disruptions, and improve business continuity (Gupta & Gupta 2025). In the steel industry, strong relational interactions and trust between suppliers and industrial customers are associated with increased CS and loyalty, highlighting the importance of long-term supplier relationships in maintaining operational continuity and achieving competitive advantage (Masitenyane & Dhurup 2023). Consistent fulfilment of customer requirements strengthens customer retention and long-term competitive advantage. From an IMP theory perspective, CL develops through sustained cooperation and trust between supply chain partners (Moorman et al. 1992). Industrial customers remain loyal when suppliers consistently demonstrate reliable operational performance and support customers’ production requirements over time. Consequently, CL is viewed as an outcome of long-term relationship development supported by effective SCP, CS, and trust.
Conceptual model
Figure 1 presents the study’s conceptual model, comprising seven predictor constructs that represent the practices of SCP linked to CS (H1–H7). In turn, CS, the mediating variable, is linked to CL, the outcome variable (H8). The study tested these relationships.
 |
FIGURE 1: Conceptual model: Proposed relationships between supply chain planning, customer satisfaction, and customer loyalty. |
|
Hypothesis formulation
Drawing on the IMP theory and the empirical evidence presented, this study proposes that SCP enhances CS, which in turn strengthens CL.
Supply chain planning and customer satisfaction
This study argues that SCP plays a central role in shaping CS. According to Abdallah et al. (2021), SCP fosters trust and information sharing among buyers and suppliers, leading to higher satisfaction, adding that customer trust and responsiveness require dependable demand forecasts. Effective SCP is considered essential for operational performance, cost efficiency, and competitive pricing. In addition, SCP aligns demand and supply by coordinating key activities such as procurement, production, and distribution, ensuring that customer requirements are met consistently. By integrating these functions, SCP reduces inefficiencies and enhances CS. It also improves forecasting accuracy, enabling organisations to anticipate customer needs and respond more effectively to demand fluctuations (Bhatti & Vui 2025). Furthermore, SCP enhances operational efficiency by optimising resource utilisation and reducing costs across the supply chain. These capabilities contribute to improved product availability, timely delivery, and enhanced value creation for customers, which ultimately strengthen CS. Based on these insights, the following hypotheses are proposed:
H1: There is a significant relationship between sales and operations planning and customer satisfaction.
H2: There is a significant relationship between demand planning and customer satisfaction.
H3: There is a significant relationship between supply planning and customer satisfaction.
H4: There is a significant relationship between production planning and customer satisfaction.
H5: There is a significant relationship between inventory management and customer satisfaction.
H6: There is a significant relationship between capacity planning and customer satisfaction.
H7: There is a significant relationship between procurement planning and customer satisfaction.
Customer satisfaction and loyalty
Although multiple factors influence CL, this study posits that CS plays a central role in fostering loyal customer behaviour. As argued by Uzir et al. (2025), CS strengthens trust and commitment between firms and their customers, which are critical precursors to long-term relational continuity. Furthermore, higher levels of CS are consistently associated with stronger CL, as satisfied customers demonstrate greater intentions to repurchase and maintain ongoing relationships with preferred suppliers (Uzir et al. 2025). Consistently, Danurdara and Masatif (2025) found that CS positively shapes loyalty by reinforcing customers’ willingness to continue purchasing from and recommending a supplier over time. As such, sustained CS is generally viewed as a key driver of CL, leading to the following hypothesis:
H8: There is a significant relationship between customer satisfaction and customer loyalty.
Research methodology
This section outlines the research methodology by detailing the study’s approach and design, the characteristics of the participants, the procedures used to gather data, the techniques applied to analyse the results, and the steps taken to ensure credibility and maintain ethical integrity.
Research approach and design
The study followed a quantitative research method to statistically test the proposed relationships between the study constructs. A quantitative approach was appropriate because the study examined eight hypotheses derived from existing literature. In addition, standardised measurement scales enabled the collection of comparable data from a relatively large sample, supporting the generalisation of the findings to comparable firms in the South African steel manufacturing industry. The study employed a cross-sectional survey design, utilising a structured questionnaire to collect data from the respondents in the steel industry at a single point in time. A cross-sectional design was considered appropriate because it enabled data to be collected from multiple firms at a single point in time, allowing the study to examine the relationships among the variables efficiently without manipulating the research environment.
Research sample
The target population consisted of supply chain and production professionals employed by steel manufacturing firms operating in the Gauteng Province. According to industry and business-intelligence databases, Gauteng Province hosts approximately 3400 iron and steel manufacturing-related firms, while steel fabrication businesses alone account for nearly 880 enterprises (Rentech Digital 2025). Because the study focused on steel manufacturing rather than the broader iron and steel sector, the sampling frame comprised steel manufacturing and fabrication firms identified through publicly available industry databases, company websites, and industry directories. Representatives of firms in the sampling frame were contacted by email and telephone and invited to participate in the study. A total of 51 steel manufacturing firms participated in the study, represented by 323 respondents. The actual respondents (unit of analysis) comprised production planners, buyers, sales personnel, warehouse employees, quality controllers, and other relevant supply chain professionals with direct involvement in planning and customer fulfilment activities. The study employed a purposive sampling technique because the technique enabled the selection of respondents with direct knowledge and experience of SCP practices within steel manufacturing firms. Employees not involved in planning or operational decision-making were considered less likely to possess the necessary knowledge to provide reliable responses. Accordingly, purposive sampling ensured that information was obtained from respondents best suited to address the study objectives (Martínez-Mesa et al. 2016). The inclusion criteria comprised at least 1 year of experience in supply chain or operations management within the steel industry and a relevant post-matric qualification. The final sample of 323 respondents was deemed acceptable based on Hair et al.’s (2019) recommendation that a minimum sample of 200 respondents is sufficient for PLS-SEM and multivariate analysis.
Data collection
Primary data were collected by using a structured questionnaire designed to measure the research constructs. The use of a structured questionnaire ensured that all respondents answered the same questions under consistent conditions, improving measurement reliability and facilitating statistical comparisons across the study constructs. Items used in the study were adapted from validated measurement scales derived from previous SCM literature. Scale items used to measure the seven SCP practices DP, SP, IM, CP, PP, SOP, and PL, were adapted from studies by Bronzo, De Oliveira and McCormack (2012), Laureano Paiva et al. (2014), Swierczek (2020), Laari et al. (2023), Ali et al. (2024), Kamewor Tetteh et al. (2025), Madegwa, Otuya and Machuki (2025), Sudjaniah et al. (2025), Mose and Magutu (2025). Items used to measure the CS construct were adapted from Javed, Rashidin and Jian (2021) and Nguyen (2021), while the CL construct was adapted from Lin et al. (2023) and Manyanga, Makanyeza and Muranda (2022). Respondents indicated their views on a five-point Likert scale. The questionnaire was distributed electronically via an online survey to facilitate broad participation and convenience. An invitation explaining the study’s purpose and containing a link to the online questionnaire was sent to eligible respondents through participating firms. The invitation requested that only employees involved in SCP, procurement, production, logistics, IM, or related operational functions complete the survey. Participation was voluntary, and responses were collected anonymously. A total of 323 usable questionnaires from 51 participating firms were retained for statistical analysis. Prior to the main study, a pilot study with 46 convenience-sampled respondents was conducted. The pilot data were then used to improve the questionnaire in areas such as content clarity, construct alignment, question flow, and measurement error reduction. The pilot data were excluded from the main survey.
Data analysis
Data were coded and analysed using SmartPLS version 4.0 software (SmartPLS GmbH, Monheim am Rhein, North Rhine-Westphalia, Germany). Descriptive statistics were used to profile respondents and summarise key variables. Partial least squares (PLS) SEM was selected because the study simultaneously examined relationships among multiple independent constructs, a mediating variable, and a dependent variable. PLS-SEM is widely applied in SCM research because it accommodates complex research models and is suitable for prediction-oriented studies (Shela et al. 2023). Path coefficients, t-statistics, and p-values were computed to interpret the model outcomes. The analysis followed the standard two-stage PLS-SEM procedure by assessing the measurement model before testing the structural model and hypotheses.
Common method variance
Common method variance (CMV) was minimised through the use of a structured survey questionnaire consisting of three clearly defined sections with explicit instructions. Different Likert-type scales were utilised across sections, and respondent anonymity was maintained to reduce response bias. In addition, a pilot study was conducted to identify and eliminate any ambiguities in the instrument. Harman’s single-factor test was performed to assess the presence of CMV. The results indicated that multiple factors emerged, collectively accounting for 63% of the total variance, with the highest contributor explaining 24%. These findings indicate that no single dominant factor was present, and the first factor did not account for the majority (i.e. more than 50%) of the variance, consistent with the threshold recommended by Fuller et al. (2016). Therefore, CMV was not considered a significant concern in this study.
Ethical considerations
Ethical clearance to conduct this study was obtained from the Vaal University of Technology Faculty Research Ethics Committee (No. FRECMS- 26032025-214). Participation by respondents was voluntary, and responses were collected anonymously to encourage accurate and unbiased disclosure. Respondents were informed of the study’s purpose, assured of confidentiality, provided with informed consent before participation, and were free to withdraw at any stage. All data were securely stored and used strictly for academic purposes.
Research results
Respondents’ demographics
A total of 500 questionnaires were distributed, with 341 returned. After excluding 18 incomplete or erroneous questionnaires, 323 usable responses remained, yielding a 65% response rate, which is considered acceptable (Baruch & Holtom 2008). Of the 323 respondents, men accounted for 53.9% (n = 174) and women for 46.1% (n = 149), reflecting a relatively balanced gender distribution. In terms of age, the largest segment of respondents (45.8%; n = 148) was 30–39 years old, indicating a higher representation of young-to-mid-career professionals in the sample. Regarding educational qualifications, the largest number of respondents (44.3%; n = 143) held a diploma. The racial composition showed that 91.3% (n = 295) were black respondents. Concerning job roles, the majority (61.9%; n = 200) were professional employees, while 22% (n = 71) were managers. In terms of employment period, the largest group of respondents was those with 3–5 years of experience in the steel industry (38.7%; n = 125). Their professional backgrounds were primarily in operations (35.6%; n = 115) and SCM (33.7%; n = 109), with 30.7% (n = 99) from other related fields. The demographic profile reflects a well-qualified, experienced sample representing a broad range of roles across the steel manufacturing supply chain.
Measurement scale accuracy
Scale accuracy measures utilised in the study were assessed by using multiple indicators, namely Cronbach’s alpha (α), composite reliability (CR), the average variance extracted (AVE) and outer loadings, as shown in Table 1.
As indicated in Table 1, Cronbach’s alpha (0.776–0.963) and CR (0.865–0.972) coefficients for all eight constructs exceeded the recommended minimum value of 0.7 (Barbera et al. 2021). These results indicate that the measurement instrument demonstrated internal consistency, producing stable and reliable data. Convergent validity was assessed by using AVE and outer loadings. The recommended minimum value for the AVE is 0.5, while those for outer loadings of approximately 0.7 or higher are generally preferred. The values reflected in Table 1 indicate that all scales exceeded these benchmarks (AVE: 0.674–0.896) (outer loadings: 0.685–0.960), confirming that each construct explained a sufficient portion of variance in its indicators, thereby satisfying the criteria for convergent validity (Chin & Yao 2023). Discriminant validity was tested by using the Fornell and Larcker (1981) criterion. The criterion specifies that √AVE values for each construct should be higher than their correlations with other constructs. The results are presented in Table 2.
| TABLE 2: Discriminant validity analysis. |
The discriminant validity results presented in Table 2 indicate fulfilment of the requirements for discriminant validity, with √AVE values exceeding most of their correlations with other constructs, suggesting that these constructs are largely distinct and measure unique aspects of the model. Three values (Customer Loyalty [CL] - Supply Planning [SP], Demand Planning [DP] - Inventory Management [IM], Procurement Planning [PL] - Sales and Operations Planning [SOP]) were higher than the correlations, representing a potential overlap. However, after considering that these three constructs were theoretically related and that the majority of the constructs fell within acceptable Fornell-Larcker criterion limits, the measurement model’s discriminant validity was deemed acceptable.
Path analysis
Path analysis, a component of SEM, was employed to examine the direct and indirect relationships among the research constructs. This technique enables the simultaneous assessment of multiple associations, providing insights into the strength and direction of relationships between variables (Valenzuela & Bachmann 2017). In this study, path analysis was visualised by using a structural model with standardised path coefficients (Figure 2).
 |
FIGURE 2: Partial least squares structural equation modelling model with standardised path coefficients. |
|
The path coefficients were generated by using the PLS method in SmartPLS. Hypotheses were validated by examining both the path coefficient (β) and significance using t-values, with a threshold of t > 1.960 and p < 0.05 for acceptance (Shela et al. 2023). The path analysis reveals that SCP practices, specifically PP and IM, are positive drivers of CS, which in turn positively influences CL, whereas SP had a significant inverse effect. These results provide partial empirical support for the importance of operational SCP in enhancing customer-related outcomes within the studied organisations. An R-squared value of 0.805 between the predictors and mediator variables implies that the seven practices of SCP explained 80.5% of the variance in CS. Likewise, an R-squared value of 0.318 between the mediator and outcome variable indicates that CS explained 31.8% of the variance in CL.
Discussion
The path analysis results in Table 3 present varying levels of influence of different SCP practices on CS, as well as the subsequent effect of CS on CL.
| TABLE 3: Path coefficient, t-statistics, and p-values. |
Confirmed positive associations between supply chain planning and customer satisfaction
Three planning practices (PP and IM) showed statistically significant relationships with CS. Both PP and IM had positive effects. The constructs PP (β = 0.246; t = 4.857; p = 0.000) and IM (β = 0.912; t = 21.415; p = 0.000) respectively exerted a positive influence on CS, indicating that improvements in these planning activities are associated with higher levels of CS. Hypotheses H4 and H5 were accepted as their t-values were above 1.96, and their p-values were below 0.05, indicating statistical significance. The results are consistent with previous studies by Utami, Hidayat and Setyariningsih (2023), and Danurdara and Masatif (2025). These results indicate that effective production and IM are crucial drivers of CS in the South African steel industry context, and that inefficiencies or mismatches in these planning areas can reduce it. Notably, the impact of IM on CS was uniquely high, which could be attributed to the critical role of inventory availability and stock accuracy in ensuring timely order fulfilment and uninterrupted product supply. As noted by Silva, Silva and Ferreira (2025), effective IM improves product availability, reduces delivery failures, and enhances CS. Industrial customers depend on reliable material availability to maintain continuous production and project execution. Consequently, effective IM supports timely order fulfilment, reliable delivery, and consistent service, thereby strengthening CS. Firms that optimise both PP and IM are therefore more likely to achieve higher CS and remain competitive in the steel industry.
Confirmed inverse relationship between supply chain planning and customer satisfaction
In contrast, SP had a significant inverse relationship with CS (β = −0.132; t = 2.781; p = 0.005), indicating that higher SP was associated with lower CS. This finding is inconsistent with an earlier study that reported a positive relationship between SP and CS (Thompson 2024). One possible explanation is that SP activities that are not regularly aligned with actual supply conditions or updated demand information may generate supply schedules that fail to meet customer expectations, thereby contributing to service shortcomings and dissatisfaction (Aidoo-Anderson et al. 2025). In addition, organisational silos, poor cross-functional collaboration, and ineffective feedback systems may further limit the ability of demand and SP processes to respond effectively to changing customer requirements.
Non-significant supply chain planning: Customer satisfaction relationships
The remaining four predictor constructs, including SOP (β = 0.194), DP (β = −0.106), CP (β = −0.088), and PL (β = −0.133), were not statistically significant, indicating that they do not influence CS, because their p-values exceeded the recommended significance level of 0.05. Accordingly, hypotheses H1, H2, H6, and H7 were rejected. Demand planning showed a weak negative but statistically insignificant relationship with CS. This finding suggests that DP alone may not be sufficient to improve CS in the South African steel manufacturing industry. Although DP supports forecasting future customer requirements, its effectiveness depends on the accuracy of forecasts and the successful integration of planning decisions with production, inventory, and SP. Where demand forecasts are inaccurate or not translated effectively into operational decisions, organisations may still experience stock shortages, delivery delays, and service failures that negatively affect CS (Amosu et al. 2024). These findings could be attributed to the indirect and upstream nature of SOP, CP, and PL, which limits their immediate perceptibility to customers and therefore reduces their direct impact on CS. Sales and operations planning primarily strengthens internal operational alignment across sales, production, and information flows, with benefits realised through intermediate outcomes such as improved reliability and lead times rather than through direct customer visibility into the planning process, thereby diluting its direct influence on CS (Rokonuzzaman 2018). Research shows that SOP’s impact is often mediated through delivery performance rather than being directly visible to customers. In the case of CP, although it enhances future resource readiness, its medium- to long-term focus on resource and production capacities does not translate directly into short-term outcomes (e.g. immediate responsiveness or delivery fulfilment) that customers typically value most, which helps explain its weak predictive effect on CS, a gap noted in reviews of capacity-management strategies in supply chains (Rajani & Heggde 2020). Likewise, PL, which ensures upstream sourcing and supplier arrangements, does not directly interact with downstream customer experience; even robust PL cannot fully buffer customers from external market volatility and price fluctuations, and customers tend to evaluate procurement processes only when they experience concrete outcomes; for example, Madondo and Manzini (2020) found that ineffective procurement procedures, such as bureaucratic delays and inconsistencies, were associated with reduced CS among buyers, illustrating that procurement’s influence on satisfaction is felt indirectly rather than through routine upstream planning. The limited direct visibility of SOP, CP, and PL on customer-facing outcomes helps explain why these constructs showed statistically insignificant relationships with CS in this study. All four constructs, i.e. SOP, DP, CP, and PL, are strategically important but exert their influence indirectly. Customers value tangible outcomes like product availability, lead time, and price stability, which IM delivers most visibly. Planning processes that operate upstream or over longer horizons tend to have an indirect effect, explaining their weaker predictive power for satisfaction despite their strategic importance.
Inventory management as the strongest predictor of customer satisfaction
Notably, the impact of IM on CS (β = 0.912) was the strongest among the predictors, indicating that improvements in IM are strongly associated with increased CS. This impact could be attributed to the fact that IM acts as a practical buffer against South Africa’s persistent infrastructure and operational volatility. Long transport distances, constrained rail capacity, port inefficiencies, and road congestion introduce uncertainty that cannot always be mitigated solely through upstream planning. Strategically positioned and well-managed inventory shortens order-to-delivery lead times, reduces exposure to logistics disruptions, and stabilises service levels, all of which customers translate into higher satisfaction. Empirical evidence (e.g. Ali et al. 2024; Silva et al. 2025) demonstrates that effective IM practices, such as accurate stock control, safety stock optimisation, and timely replenishment, significantly enhance order fulfilment reliability and CS by ensuring consistent product availability and reducing delivery failures. Furthermore, disciplined inventory control supports contractual reliability during periods of price volatility and operational shocks, enabling firms to honour delivery commitments and maintain consistent performance, outcomes closely associated with trust and satisfaction in business-to-business markets (Epoh, Langton & Mafini 2024). These results highlight that IM serves as the most direct and influential mechanism through which effective SCP drives CS in the South African steel industry.
Customer satisfaction and loyalty
The association between CS and CL was strong and positive (with a β coefficient of = 0.564, t = 14.916; p = 0.000), indicating that improvements in CS are strongly associated with increased CL. Hypothesis H8 was therefore accepted. The results are consistent with previous research by Yum and Yoo (2023), which produced comparable results. The strong, positive link between CS and CL shows that steel manufacturers who reliably deliver high-quality products and responsive service foster enduring relationships with their clients. In South Africa, where timely steel deliveries are essential for major infrastructure and mining projects, high satisfaction levels encourage repeat purchases and reduce the likelihood of customers switching suppliers. Furthermore, amid logistics bottlenecks and price volatility, companies that consistently meet customer expectations build trust, strengthening the retention of key accounts in a competitive market.
The results in Table 4 indicate that CS did not significantly mediate the relationship between most SCP practices and CL, except for PL, PP, and SP. Specifically, the indirect effects of DP, IM, SOP, and CP on CL via CS were statistically insignificant, as evidenced by p-values higher than 0.05 and t-values lower than 1.96. This outcome suggests that improvements in these planning activities, although potentially beneficial for operational performance, do not necessarily transmit their influence through CS to enhance CL. These findings align with prior research showing that certain SCP practices may improve internal efficiency or operational robustness without directly impacting CL unless they produce outcomes that customers explicitly experience, such as delivery reliability or product availability (Petropoulos et al. 2026). In contrast, the paths PL → CS → CL, PP → CS → CL, and SP → CS → CL showed statistically significant mediation effects, indicating that CS serves as an important mechanism through which these practices influence loyalty. For PL, this effect suggests that when procurement activities help stabilise costs or reduce supply disruptions in ways customers can perceive, they enhance satisfaction and, in turn, strengthen loyalty. This pattern echoes findings in supply chain research, in which effective upstream activities, when translated into downstream service performance (e.g. price stability or on-time fulfilment), positively shape customer perceptions and long-term loyalty (Nguyen, Nguyen & Tran 2025). Similarly, SP’s mediated effect implies that planning alignment, which successfully balances supply and demand, can improve CS enough to affect loyalty, even if the direct link between SP and CL is weak. For PP, the significant mediated effect may be as a result of customers perceiving better product performance and alignment with requirements when product plans are well executed, thereby increasing satisfaction and loyalty. Collectively, these results suggest that while not all SCP practices influence loyalty through satisfaction, those that translate planning effectiveness into visible customer outcomes, such as service reliability or fulfilment consistency, have significant indirect effects.
Conclusion
This study extends the existing literature on SCP by empirically examining its multidimensional effects on CS and CL within the South African steel-manufacturing context. While prior research has often treated SCP as a uniform predictor of performance outcomes, this study’s findings reveal a more nuanced pattern of relationships. Specifically, certain SCP practices, such as IM and PP, were found to enhance CS, while SP demonstrated a significant negative influence on CS. Furthermore, three planning practices, namely SOP, CP, and PL, were statistically insignificant in their direct relationships with CS, indicating that their influence does not readily translate into CS. These results highlight the importance of disaggregating SCP into its constituent components and recognising their differential effects on customer-focused outcomes. In doing so, the study contributes to theory by refining the understanding of how specific planning practices shape service-oriented performance rather than assuming uniform strategic impact across SCP practices.
Contributions
The study contributes to the limited empirical literature on SCP in the South African steel manufacturing industry. From a practical perspective, the findings emphasise the critical role of IM and PP in driving CS and, indirectly, CL. Managers in the steel manufacturing sector are therefore encouraged to prioritise these planning areas, as they deliver outcomes that are most visible and meaningful to customers, such as product availability, delivery reliability, and fulfilment consistency. At the same time, the negative and insignificant effects observed for certain planning practices suggest the need to address misalignments between demand and SP and to strengthen execution capabilities when planning benefits do not translate into customer-perceived value. Because the steel industry operates primarily in a B2B environment, where customers depend on reliable supply, consistent product quality, and long-term supplier relationships, improving CS is essential for strengthening CL and sustaining competitive advantage. These insights provide actionable guidance for improving operational decision-making, aligning planning processes better with customer expectations, and enhancing competitiveness and long-term sustainability in a challenging and volatile steel industry environment. From a theoretical perspective, the findings extend IMP theory by showing that customer relationships in B2B steel manufacturing are influenced by individual planning practices rather than SCP as a single capability. IM and PP had stronger effects on CS than upstream planning activities did, indicating that dependable operational performance is central to relationship development. These findings reinforce IMP theory by demonstrating that reliable planning practices strengthen customer relationships through improved operational performance.
Limitations and suggestions for future research
This study is limited by its cross-sectional design, which restricts causal inference, and its focus on Gauteng Province, which may affect generalisability to other contexts or sectors. Future studies could adopt longitudinal designs to examine the dynamic effects of SCP on CS and CL over time. Comparative research across industries and countries would provide broader insights into the contextual outcomes of SCP and the factors driving CS and CL. Furthermore, exploring moderating variables, such as technological adoption, market volatility, or organisational culture, could deepen the understanding of when and how SCP practices translate into improved customer outcomes. Future studies could compare customer perceptions across industries to determine whether the relationships identified in the South African steel manufacturing industry apply to other B2B manufacturing environments.
Acknowledgements
This article is based on research originally conducted as part of Lucky Shashaoka’s master’s dissertation titled ‘Linking supply chain planning to customer satisfaction and loyalty in the steel manufacturing industry in Gauteng province’, submitted to the Faculty of Management Sciences, Vaal University of Technology in 2025. The dissertation is currently unpublished and not publicly available. The dissertation was supervised by Chengedzai Mafini. The dissertation was reworked, revised, and adapted into a journal article for publication. The author confirms that the content has not been previously published or disseminated and complies with ethical standards for original publication.
Competing interests
The authors declare that they have no financial or personal relationships that may have inappropriately influenced them in writing this article.
CRediT authorship contribution
Lucky Shashaoka: Conceptualisation, Writing – original draft. Chengedzai Mafini: Methodology, Supervision. Gladys N. Mahache: Writing – review & editing. All authors reviewed the article, contributed to the discussion of results, approved the final version for submission and publication, and take responsibility for the integrity of its findings.
Funding information
This research received no specific grant from any funding agency in the public, commercial, or not-for-profit sectors.
Data availability
Data sharing is not applicable to this article as no new data were created or analysed in this study.
Disclaimer
The views and opinions expressed in this article are those of the authors and are the product of professional research. They do not necessarily reflect the official policy or position of any affiliated institution, funder, agency or that of the publisher. The authors are responsible for this article’s results, findings and content.
References
Abdallah, A.B., Alfar, N.A. & Alhyari, S., 2021, ‘The effect of supply chain quality management on supply chain performance: The indirect roles of supply chain agility and innovation’, International Journal of Physical Distribution & Logistics Management 51(7), 785–812. https://doi.org/10.1108/IJPDLM-01-2020-0011
Ackah, D., 2025, ‘Analysing the effect of procurement management practices on supply chain performance’, African Journal of Procurement, Logistics & Supply Chain Management 8(4), 25–45. https://doi.org/10.4314/ajplscm.v8i4.3
Aidoo-Anderson, A., Polychronakis, Y., Sapountzis, S. & Kelly, S., 2025, ‘Investigating demand forecasting practices and challenges in Ghana’s Manufacturing Pharmaceutical (MPharma) small and medium enterprises (SMEs): Insights and recommendations’, International Journal of Production Research 63(21), 7899–7920. https://doi.org/10.1080/00207543.2025.2508335
Ali, A.A.A., Fayad, A.A.S., Alomair, A. & Al Naim, A.S., 2024, ‘The role of digital supply chain on inventory management effectiveness within engineering companies in Jordan’, Sustainability 16(18), 8031. https://doi.org/10.3390/su16188031
Amosu, O.R., Kumar, P., Ogunsuji, Y.M., Oni, S. & Faworaja, O., 2024, ‘AI-driven demand forecasting: Enhancing inventory management and customer satisfaction’, World Journal of Advanced Research and Reviews 23(2), 708–719. https://doi.org/10.30574/wjarr.2024.23.2.2394
Anaba, D.C., Kess-Momoh, A.J. & Ayodeji, S.A., 2024, ‘Optimizing supply chain and logistics management: A review of modern practices’, Open Access Research Journal of Science and Technology 11(2), 20–28. https://doi.org/10.53022/oarjst.2024.11.2.0083
Barbera, J., Naibert, N., Komperda, R. & Pentecost, T.C., 2021, ‘Clarity on Cronbach’s alpha use’, Journal of Chemical Education 98, 257–258. https://doi.org/10.1021/acs.jchemed.0c00183
Baruch, Y. & Holtom, B.C., 2008, ‘Survey response rate levels and trends in organizational research’, Human Relations 61(8), 1139–1160. https://doi.org/10.1177/0018726708094863
Bhatti, M.A. & Vui, C.N., 2025, ‘Impact of supply chain management integration, capabilities and resilience to improve supply chain performance of construction industry: Mediating effect of supply chain flexibility’, International Journal of Construction Supply Chain Management 15(1), 171–188. https://doi.org/10.14424/ijcscm202515110
Bronzo, M., De Oliveira, M.P.V. & McCormack, K., 2012, ‘Planning, capabilities, and performance: An integrated value approach’, Management Decision 50(6), 1001–1021. https://doi.org/10.1108/00251741211238300
Buschiazzo, M., Mula, J. & Campuzano Bolarín, F., 2020, ‘Simulation optimization for the inventory management of healthcare supplies’, International Journal of Simulation Modelling 19(2), 255–266. https://doi.org/10.2507/IJSIMM19-2-514
Cheng, C., Chu, H., Zhang, L. & Tang, L., 2024, ‘Green supply chain for steel raw materials under price and demand uncertainty’, Journal of Cleaner Production 462, 142621. https://doi.org/10.1016/j.jclepro.2024.142621
Chin, C.L. & Yao, G., 2023, ‘Convergent validity’, in F. Maggino (ed.), Encyclopedia of quality of life and well-being research, pp. 1398–1399, Springer, Cham. https://doi.org/10.1007/978-3-031-17299-1_573
Danurdara, A.B. & Masatif, A., 2025, ‘Assessing the customer experience quality and customer loyalty: The mediating role of customer satisfaction’, Innovative Marketing 21(2), 248–259. https://doi.org/10.21511/im.21(2).2025.20
Department of Trade Industry and Competition (DTIC), 2021, The South African steel and metal fabrication master plan 1.0, viewed 14 January 2026, from https://www.thedtic.gov.za/wp-content/uploads/Steel_Industry_Master_Plan.pdf.
Epoh, R.L., Langton, I. & Mafini, C., 2024, ‘A model for green supply chain management in the South African manufacturing sector’, Cogent Business Management 11(1), 2390213. https://doi.org/10.1080/23311975.2024.2390213
Fornell, C. & Larcker, D.F., 1981, ‘Evaluating structural equation models with unobservable variables and measurement error’, Journal of Marketing Research 18(1), 39–50. https://doi.org/10.2307/3151312
Ford, D., 1980, ‘The development of buyer-seller relationships in industrial markets’, European Journal of Marketing 14(5/6), 339–353. https://doi.org/10.1108/EUM0000000004910
Ford, D., 1997, Understanding business markets: Interaction, relationships and networks, The Dryden Press, London.
Fuller, C.M., Simmering, M.J., Atinc, G., Atinc, Y. & Babin, B.J., 2016, ‘Common methods variance detection in business research’, Journal of Business Research 69(8), 3192–3198. https://doi.org/10.1016/j.jbusres.2015.12.008
Govindan, K. & Cheng, T.C.E., 2018, ‘Advances in stochastic programming and robust optimization for supply chain planning’, Computers & Operations Research 100, 262–269. https://doi.org/10.1016/j.cor.2018.07.027
Gupta, G. & Gupta, M., 2025, ‘Supplier reliability and relationship management: Critical determinants of contemporary U.S. supply chain performance and resilience’, International Journal of Pharma Insight Studies 2(3), 13–17. https://doi.org/10.54660/IJPIS.2025.2.3.13-16
Hair, J.F., Black, W.C., Babin, B.J. & Anderson, R.E., 2019, Multivariate data analysis, 8th edn., Cengage Learning, Andover.
Kalla, C., Scavarda, L.F., Caiado, R.G.G. & Hellingrath, B., 2026, ‘Adapting sales and operations planning to dynamic and complex supply chains’, Review of Managerial Science 20(4), 1131–1156. https://doi.org/10.1007/s11846-025-00894-x
Kamewor Tetteh, F., Kwatia, D.A., Asante, D., Kyeremeh, A. & Nyame, P.E., 2025, ‘Leveraging procurement capabilities and planning for project success in the construction industry in Ghana’, Built Environment Project and Asset Management 15(1), 18–32. https://doi.org/10.1108/BEPAM-02-2024-0036
Khoza, S., Mafini, C. & Loury Okoumba, W.V., 2022, ‘Lean practices and supply-chain competitiveness in the steel industry in Gauteng, South Africa’, South African Journal of Economic and Management Sciences 25(1), a4617. https://doi.org/10.4102/sajems.v25i1.4617.
Javed, S., Rashidin, M.S. & Jian, W., 2021, ‘Predictors and outcome of customer satisfaction: Moderating effect of social trust and corporate social responsibility’, Future Business Journal 7(1), 12. https://doi.org/10.1186/s43093-021-00055-y
Laari, S., Lorentz, H., Jonsson, P. & Lindau, R., 2023, ‘Procurement’s role in resolving demand–supply imbalances: An information processing theory perspective’, International Journal of Operations & Production Management 43(13), 68–100. https://doi.org/10.1108/IJOPM-06-2022-0382
Laureano Paiva, E., Teixeira, R., Marques Vieira, L. & Beheregaray Finger, A., 2014, ‘Supply chain planning and trust: Two sides of the same coin’, Industrial Management & Data Systems 114(3), 405–420. https://doi.org/10.1108/IMDS-07-2013-0324
Lin, X.Y., Lee, J., Johan, M.R.M., Ali, A.B.M. & Shao, Z., 2023, ‘Building customer loyalty in online retail industry: A survey among youth in Klang Valley’, Jurnal Intelek 18(1), 131–143.
Luthuli, T.V. & Pradhan, A., 2020, ‘The impact of inventory control on productivity of steel firms’, in Proceedings of the international conference on industrial engineering and operations management, Dubai, United Arab Emirates, March 10–12, 2020, pp. 2792–2804, IEOM Society International, Southfield, Michigan, USA.
Mabotja, T.P., 2022, ‘An integrated supply chain management model for the South African steel manufacturing industry in the Fourth Industrial Revolution era’, PhD thesis, University of Johannesburg, viewed n.d., from https://hdl.handle.net/10210/502604.
Madegwa, B.Y., Otuya, W. & Machuki, K., 2025, ‘Effect of procurement planning on supply chain performance: Evidence from the salvation Army Kenya West Territory’, Journal of Business and Social Review in Emerging Economies 11(3), 277–288. https://doi.org/10.26710/jbsee.v11i3.3429
Madondo, P. & Manzini, S., 2020, ‘An analysis of the effect of procurement procedures on customer satisfaction: A case study of the United Refineries Limited in Bulawayo’, International Journal of Entrepreneurial Research 3(4), 113–124. https://doi.org/10.31580/ijer.v3i4.1605
Mahajan, J. & Sah, J., 2025, ‘The role of customer satisfaction in retaining industrial clients in steel industry’, International Journal of Engineering Technologies and Management Research 12(3), 32–41. https://doi.org/10.29121/ijetmr.v12.i3.2025.1699
Manyanga, W., Makanyeza, C. & Muranda, Z., 2022, ‘The effect of customer experience, customer satisfaction and word-of-mouth intention on customer loyalty: The moderating role of consumer demographics’, Cogent Business & Management 9(1), 1–20. https://doi.org/10.1080/23311975.2022.2082015
Martínez-Mesa, J., González-Chica, D.A., Duquia, R.P., Bonamigo, R.R. & Bastos, J.L., 2016, ‘Sampling: How to select participants in my research study?’, A Bras Dermatol 91(3), 326–330. https://doi.org/10.1590/abd1806-4841.20165254
Masitenyane, L.A. & Dhurup, M., 2023, ‘Predictors of business-to-business loyalty and repurchase intentions in South Africa’s concrete product market’, South African Journal of Business Management 54(1), a3575. https://doi.org/10.4102/sajbm.v54i1.3575
Moorman, C., Deshpande, R. & Zaltman, G., 1992, ‘Factors affecting trust in market research relationship’, Journal of Marketing 57(1), 81–101. https://doi.org/10.1177/002224299305700106
Mose, J.M. & Magutu, P.O., 2025, ‘The effect of capacity planning on supply chain performance of manufacturing firms’, International Journal of Professional Business Review 10(2), e05302. https://doi.org/10.26668/businessreview/2025.v10i2.5302
Nguyen, N.T.V., Nguyen, M.K. & Tran, M.N., 2025, ‘Evaluating the impact of supply chain factors on customer satisfaction and loyalty in Vietnam’, Journal of Distribution Science 23(2), 51–61. http://doi.org/10.15722/jds.23.02.202502.51
Nguyen, T.L.H., 2021, ‘Total quality management and customer loyalty: A survey of the quality management’, American Journal of Management Science and Engineering 6(3), 56–62. https://doi.org/10.11648/j.ajmse.20210603.11
Nieto-Rodriguez, A., 2021, Harvard business review project management handbook: how to launch, lead, and sponsor successful projects, Harvard Business Review Press, Boston, MA.
Obafemi, O.O., Onyebuchi, O. & Omoyebagbe, O.P., 2023, ‘Impact of customer loyalty on organizational performance’, IIARD International Journal of Economics and Business Management 8(5), 56–62. https://doi.org/10.56201/ijebm.v8.no5.2022.pg56.62
Obiri-Yeboah, H., Amoatey, C.T., Ottou, J. & Yirenkyi-Fianko, A., 2025, ‘Supply chain management practices and the organizational performance of manufacturing SMEs in an emerging economy: The mediating role of supply chain performance’, Modern Supply Chain Research and Applications 7(3), 372–403. https://doi.org/10.1108/MSCRA-12-2024-0057
Petropoulos, F., Akkermans, H., Aksin, O.Z., Ali, I., Babai, M.Z., Barbosa-Povoa, A. et al., 2026, ‘Operations & supply chain management: Principles and practice’, International Journal of Production Research 64(1), 330–513. https://doi.org/10.1080/00207543.2025.2555531
Rajani, R.L. & Heggde, G.S., 2020, ‘Capacity management strategies in supply chains – A critical review and directions for future’, International Journal of Business Excellence 21(1), 81–117. https://doi.org/10.1504/IJBEX.2020.106951
Raja Santhi, A. & Muthuswamy, P., 2022, ‘Influence of blockchain technology in manufacturing supply chain and logistics’, Logistics 6(1), 15. https://doi.org/10.3390/logistics6010015
Rentech Digital, 2025, List of steel fabricators in Johannesburg, viewed 25 April 2026, from https://rentechdigital.com/smartscraper/business-report-details/south-africa/gauteng/list-of-steel-fabricators-in-johannesburg.
Reyes, J., Mula, J. & Díaz-Madroñero, M., 2023, ‘Development of a conceptual model for lean supply chain planning in industry 4.0: Multidimensional analysis for operations management’, Production Planning & Control 34(12), 1209–1224. https://doi.org/10.1080/09537287.2021.1993373
Ritter, T., Wilkinson, I.F. & Johnston, W.J., 2004, ‘Managing in complex business networks’, Industrial Marketing Management 33(3), 175–183. https://doi.org/10.1016/j.indmarman.2003.10.016
Roberts-Lombard, M. & Jaiyeoba, O., 2025, ‘Unlocking consumer behaviour: How satisfaction and/or delight, trust and perceived value drive behavioural intentions’, South African Journal of Economic and Management Sciences 28(1), a6160. https://doi.org/10.4102/SAJEMS.v28i1.6160
Rokonuzzaman, M., 2018, ‘The integration of extended supply chain with sales and operation planning: A conceptual framework’, Logistics 2(2), 8. https://doi.org/10.3390/logistics2020008
Sengupta, S., Dreyer, H.C. & Jonsson, P., 2025, ‘Impact pathways: Technology-aided supply chain planning for resilience’, International Journal of Operations & Production Management 45(2), 416–433. https://doi.org/10.1108/IJOPM-09-2023-0727
Shabani-Naeeni, F. & Ghasemy Yaghin, R., 2021, ‘Incorporating data quality into a multi-product procurement planning under risk’, Journal of Business & Industrial Marketing 36(7), 1176–1190. https://doi.org/10.1108/JBIM-02-2020-0108
Shela, V., Ramayah, T., Aravindan, K.L., Ahmad, N.H. & Alzahrani, A.I., 2023, ‘Run! This road has no ending! A systematic review of PLS-SEM application in strategic management research among developing nations’, Heliyon 9(12), e22476. https://doi.org/10.1016/j.heliyon.2023.e22476
Silva, Â., Silva, M. & Ferreira, A.C., 2025, ‘Inventory management and its influence on the supply of high-value products: Case study evidence’, Logistics 9(4), 170. https://doi.org/10.3390/logistics9040170
South African Iron and Steel Institute (SAISI), 2023, Preserving the South African steel industry is pivotal for grow, viewed 14 January 2026, from https://www.saisi.org/wp-content/uploads/2023/06/SAISI-Newsletter-May2023.pdf.
Statistics South Africa (Stats SA), 2025, Statistics South Africa on Quarterly Labour Force Survey (QLFS) – Q1: 2025, Government of South Africa, viewed 09 January 2026, from https://www.gov.za/news/media-statements/statistics-south-africa-quarterly-labour-force-survey-qlfs-%E2%80%93-q1-2025-13-may.
Sudjaniah, D., Lu’luatuwwafiroh., Utami, M., Sugiyono, A.Y., & Yaqin, A., 2025, ‘Impact of production planning, inventory management, and demand forecast accuracy on operational performance: The moderating role of sustainability-oriented green supply chain management among retail SMES in Jakarta’, International Journal of Social Service and Research 5(9), 1070–1087. https://doi.org/10.46799/ijssr.v5i9.1307
Sun, H., Vanajakumari, M., Sriskandarajah, C. & Kumar, S., 2024, ‘Supply chain planning with free trade zone and uncertain demand’, Transportation Research Part E: Logistics and Transportation Review 192, 103771. https://doi.org/10.1016/j.tre.2024.103771
Swierczek, A., 2020, ‘Investigating the role of demand planning as a higher-order construct in mitigating disruptions in the European supply chains’, International Journal of Logistics Management 31(3), 665–696. https://doi.org/10.1108/IJLM-08-2019-0218
Taxakis, K. & Papadopoulos, C., 2016, ‘A design model and a production–distribution and inventory planning model in multi-product supply chain networks’, International Journal of Production Research 54(21), 6436–6457. https://doi.org/10.1080/00207543.2016.1158882
Thomé, A.M., Scavarda, L.F., Fernandez, N.S. & Scavarda, A.J., 2012, ‘Sales and operations planning: A research synthesis’, International Journal of Production Economics 138(1), 1–13. https://doi.org/10.1016/j.ijpe.2011.11.027
Thompson, D.S., 2024, ‘The impact of demand forecasting accuracy on customer satisfaction’, International Journal of Supply Chain Management 9(5), 55–66. https://doi.org/10.47604/ijscm.3117
Utami, B., Hidayat, M.S. & Setyariningsih, E., 2023, ‘The relationship between customer satisfaction and loyalty: A systematic literature review’, International Journal of Social Service and Research 3(1), 54–62. https://doi.org/10.46799/ijssr.v3i1.222
Uzir, M.U.H., Bukari, Z., Wahab, S.N., Jerin, I., Rasul, T. & Amin, M.B., 2025, ‘Investigation of customer satisfaction, brand trust and brand loyalty in electronics home appliances: CB-SEM approach’, Social Sciences & Humanities Open 12, 101943. https://doi.org/10.1016/j.ssaho.2025.101943
Uzsoy, R., Fowler, J.W. & Mönch, L., 2018, ‘A survey of semiconductor supply chain models Part II: Demand planning, inventory management, and capacity planning’, International Journal of Production Research 56(13), 4546–4564. https://doi.org/10.1080/00207543.2018.1424363
Valenzuela, S. & Bachmann, I., 2017, ‘Path analysis’, in J. Matthes, C.S. Davis & R.F. Potter (eds.), The international encyclopedia of communication research methods, pp. 1–9, John Wiley & Sons, Hoboken, NJ. https://doi.org/10.1002/9781118901731.iecrm0181
Wang, H., Ko, E., Woodside, A. & Yu, J., 2021, ‘SNS marketing activities as a sustainable competitive advantage and traditional market equity’, Journal of Business Research 130, 378–383. https://doi.org/10.1016/j.jbusres.2020.06.005
Yao, X., Almatooq, N., Askin, R.G. & Gruber, G., 2022, ‘Capacity planning and production scheduling integration: Improving operational efficiency via detailed modelling’, International Journal of Production Research 60(9), 1–23. https://doi.org/10.1080/00207543.2022.2028031
Yum, K. & Yoo, B., 2023, ‘The impact of service quality on customer loyalty through customer satisfaction in mobile social media’, Sustainability 15(14), 11214. https://doi.org/10.3390/su151411214
Zulu, M.S., Pretorius, M.W. & Van der Lingen, E., 2021, ‘Strategic competitiveness of the South African mining industry in the age of the Fourth Industrial Revolution’, South African Journal of Industrial Engineering 32(3), 185–200. https://doi.org/10.7166/32-3-2627
|